Monday, May 24, 2010

Gearing Up for the Aliner's "Maidain" Voyage

Here's my list from a few weeks ago....

  • seal up any holes around gaslines.
  • coat bottom.
  • install one regular outlet.
  • install 12v plug.
  • replace upper foam weatherstripping.
  • fix any left over outside caulking.
  • replace broken vent (purchased already).
  • finish curtains.
  • install new curtain rods.
  • install cabinet door clasps.
  • install cabinet handles.
  • finish bed panel.
  • sell fridge (dometic rm 2310....$250 if you're looking).
  • celebrate and go camping!
I can deal with that! The left over caulking is very minor, probably over doing it even...so when we get to it will do. Curtain rods, maybe today....probably tomorrow. And the door clasp can wait too. It's just one and I am packing clothes in that cabinet. The fridge is still available. I've had a couple people ask about it, no one follows through. Not really a biggie on my list anyway, someone will take it when they need it. Celebrate and go camping :) that's this weekend! Mike heads out Thursday with Deogee, we head out Friday. I hope Taylor will be okay about missing drivers ed Friday....I bet a lot will be out anyway. I can not wait to go camping, period, Aliner or not. But this trip will be special! I am "repacking" for the Aliner. I'd like to able to load her up and leave it, but some of tenting gear is going to have to be shared, plus the girls will be tenting. Some things will stay just for the Aliner....I do need to stop picking things up here and there though. Even I am getting tired of hearing myself say "this will look cute in the Aliner", lol.
Add to my list...take some finished pics!


No comments:

Post a Comment