Lots of rain in the forecast for the next week. Kenzie's 10th birthday is on Friday and we are having a get together on Saturday.....hopefully the weather will hold out for that stuff at least. We closed up shop this afternoon, reinstalled the passenger side front storage door and put pretty much every thing away for now. Billy is here until the 30th and then we are off to camp on the 6th. We got a lot done this weekend, but I wonder how much more we'll get done in the next few weeks. I'll work on the curtains at night....not tonight though, so tired. I'm also trying to keep up with some detail work, like cleaning up the old faucet for reuse. Problem is though that I left it in the counter top out in the rain which swelled and now I can not get it out, grrrr. I'll get it out though, don't feel like spending much more on this project. Anything else really that I "want" to replace will be waiting till Summers future. I'm also going to clean up the old fridge and post it up on Criagslist. If anyone is looking for a Dometic LP/Electric....not sure of the model cuz I do not wanna get up right now....fridge, let me know.
Showing posts with label Update 10. Show all posts
Showing posts with label Update 10. Show all posts
Monday, July 20, 2009
Rain on the Way.
Lots of rain in the forecast for the next week. Kenzie's 10th birthday is on Friday and we are having a get together on Saturday.....hopefully the weather will hold out for that stuff at least. We closed up shop this afternoon, reinstalled the passenger side front storage door and put pretty much every thing away for now. Billy is here until the 30th and then we are off to camp on the 6th. We got a lot done this weekend, but I wonder how much more we'll get done in the next few weeks. I'll work on the curtains at night....not tonight though, so tired. I'm also trying to keep up with some detail work, like cleaning up the old faucet for reuse. Problem is though that I left it in the counter top out in the rain which swelled and now I can not get it out, grrrr. I'll get it out though, don't feel like spending much more on this project. Anything else really that I "want" to replace will be waiting till Summers future. I'm also going to clean up the old fridge and post it up on Criagslist. If anyone is looking for a Dometic LP/Electric....not sure of the model cuz I do not wanna get up right now....fridge, let me know.
Sunday, July 19, 2009
Update 10

We got a lot done this weekend!
- The two larger cabinets are installed with wiring and battery vent plumbed.
- End panels installed (which included a lot of clean up and old staple removal!).
- Rock guard and tow tongue stripped, primed and painted.
- Old fridge vents closed.
- Several outside openings cleaned up and re-caulked.
- Curtains made for the three triangle windows and the big "passenger side" window.
Saturday Mike and I worked earlier in the day on the end panels. There were a ton of staples to remove, but overall it went pretty smooth. Later in the day after Billy came home we worked on the front tongue, the rock guard and planning the electrical system. We also closed up the fridge vents, removed the fan and resealed a lot of the outside openings.
Sunday, today, we installed the two larger cabinets. We had to remove the toe kicks. The smaller ones are uppers so did not have them and fit. Mike used a straight edge and the router to trim them down. They build cleats and made cut outs for the battery vent, electrical and just a bit into the wheel well to make sure the heater will be centered over it's vent/intake. I also cleaned up a lot of the old cabinets and debris. I'm burning all the old wood, the rotted flooring went into the woods and recycling the old plastic and metal we removed.
You can see more pics under "Update 10" on the right hand side bar.